1140-Ton Scrap of Windmill Support Fixtures Surplus to GE Renewable Offshore Wind

Started: 11 December 2025 at 18:00 GMT
Ended: 14 January 2026 at 18:00 GMT
1140-Ton Total Scrap Steel, Consisting of Windmill Assembly Fixtures (NOTE: SUCCESSFUL BIDDER WILL BE ABLE TO PERFORM THEIR OWN WORK. THEY MUST AGREE TO THE GE EHS TERMS AND CONDITIONS FOR CONTRACTORS. CONTACT US FOR SUPPORT TO REGISTER IN THE GE EHS CONTRACTOR SYSTEM. (ALL WEIGHTS WERE CALCULATED BASED ON GE DRAWINGS AND SPECIFICATIONS. NO REFUNDS WILL BE GIVEN FOR ANYTHING UNDER 1140 TONS. NO ADDITIONAL CHARGE FOR ANYTHING OVER 1140 TONS).
  •  site
    LOT 1
    1,140-Ton Total Scrap of Windmill Assembly Fixtures
    Contents as Described Total 1,140 Ton (US) of VYW Equipment Located in New Bedford, MA including: (4) Blade Rack-Root, (4) Blade Rack-Tip, (2) Blade Rack-Spreader, (1) Blade Rack Assembly Structure-Root, (1) Blade Rack Assembly Structure-Ti...
    Sale has ended